Front matter
- Cover: project name and address, owner, architect, general contractor, completion date, your logo
- Table of contents with page numbers
- Project directory: owner, design team, general contractor, and each subcontractor and supplier with contact details
- Warranty summary: each warranty, its start date and its length
One section per division
Give each division that has work a divider page, then its documents in this order:
- Warranties and guarantees
- O&M information and manufacturer instructions
- Test reports, including TAB
- As-builts and record drawings
Inside each type, group documents by subcontractor or supplier, and by system where a division has several.
Back matter
- Attic stock and spare-parts receipts
- Keys and keying schedule
- Certificates and inspection reports
Finishing the PDF
Bookmark every division, every document type and every document, so the facility team can jump straight to what they need. Keep the original files alongside the manual.
CloseoutReady builds this structure from your closeout folder: cover, contents, dividers, packages and bookmarks. 7-day free trial per project, then $199 per project.